Bournewood Health Systems
Renovation of existing showers in five units and flooring replacement for a behavioral health system in Chestnut Hill, Massachusetts.
Stage by stage
Each stage of the work, in order. Frames marked Illustration show that type of work; the photographs of the finished spaces are our own.
Illustration01 · Demolition
In each of the five units, the existing showers and floor finishes were removed down to the substrate.
Illustration02 · Rough-in
New backer board, waterproofing, and shower bases were installed before any tile went on.
Illustration03 · Tile and flooring
Large-format wall tile and new flooring were installed to complete each shower room.
Our photograph04 · Handover
Renovated shower rooms returned to service, unit by unit.
Completed
Our own photographs of the completed project, area by area.
01 · 7 photographs
Existing showers renovated with large-format grey wall tile, new shower bays, and new flooring.







02 · 5 photographs
Restrooms finished in the same grey tile with grab bars, and stainless steel wash troughs.





Trades we self-performed